Cellular concrete is gaining popularity more and more. Choosing from which to build their home, many developers prefer it cellular or aerated concrete. There are many reasons for this, the main of which is material properties. One type of aerated concrete is a twin block. It is made in an autoclave at a temperature of 180˚C under a pressure of 12 atmospheres. This high-tech material meets all standards and modern requirements and is used in the construction of various buildings. To make a twin-block house with your own hands, you do not need deep professional knowledge and skills in construction. One of the advantages of this building material is its ease of operation. After reviewing the technology and studying the details of construction, you can build such a house yourself.
Twin block
When building a house, everyone wants to make it quickly, efficiently, so that it was durable, warm and stood for many years. All this can be achieved using a twin block. Let's consider its main qualities and advantages:
Walls are built quickly
All these advantages made the twin blocks one of the most popular materials for construction. Buildings are erected from it quickly, they are warm and can stand for more than 30 years, while you spend less on building such a house than building a house of bricks.
Having seen all the advantages of the material, you can proceed to the preparatory work. It all starts with the project of the future house, which must be done in accordance with the norms. What for? First of all, to legalize your house and decorate the house as your property, because without a project it will not work. Moreover, you will need it at the stage of applying for a construction permit. Secondly, you will have accurate information on what and how to do, how much material you need, money and what work to do, without a project a house can be built incorrectly and will not last long.
A competent drawing is needed
Such a project should include an architectural section with detailed drawings and future home plan: rooms, floors, basement, attic, roof. Constructive section, which provides general data, the layout of the foundation, stairs, floors, truss structure, features of materials and products, as well as detailed drawings of individual nodes. Another plan should include sections on conducting communications: electricity, water, sewage, heating and gas equipment.
Project of a low-rise house
It immediately becomes clear that to competently make such a project independently, without experience and knowledge is very hard. If you are a non-specialist in architecture, it is better to entrust this work to professionals who can make a quality project based on your wishes. All you have to do is pay for the work done. There is another option - a detailed plan can be found on the Internet. It can also be bought or downloaded for free. The first option is more reliable, since we all know that free cheese lies only in a mousetrap. Such projects can be both good and illiterately executed, then you cannot avoid problems.
A prepared platform
is needed When your plan is ready, you can start preparing the construction. The first thing you need to take care of the place to store material and tools. After all, for the construction you need twin blocks, sand, cement, which must remain dry. You also need to properly equip the construction site and comply with all safety measures. It is important to conduct electricity in advance.
For the construction will need blocks, so they need to prepare. If the plan does not calculate the number of blocks needed for construction, then you can do it yourself, because you don’t want to overpay for extra blocks or go for new ones. So, based on the dimensions that are in the project, you need to know the area of the walls. For this, the perimeter of all walls must be multiplied by the height. For example, the walls of your house have a length of 13 and 10 m, and their height is 6 m. It turns out:
13 + 13 + 10 + 10 = 46 m
6 * 46 = 276 m 2
The area of the walls of the house is 276 m 2 . To determine how many blocks you need, this number must be multiplied by the thickness of the blocks. Then you will know the number of cubes of blocks. It is clear that the box of the house will not be solid, since there will be unencumbered windows and doors in the house, but it is better to take several blocks more in case of an emergency.
It should be noted that it is necessary to transport the blocks very carefully so that they do not lose their geometric shapes and are not damaged. All units must be well packaged. After delivery, the material must be moved to a dry prepared place, where it will wait in the wings. After all the preparatory work, let's take a look at how to build a twin-block house.
Types of twin blocks
To have an idea about that you need to do to build a house, you need to briefly consider all the upcoming work. The technology of building a house from twinblok is quite simple, you just need to follow certain rules and sequence. After everything is prepared, there is a project, the material is purchased and placed, you need:
Preparation for filling the reinforced belt
These are all the basic work that you must do to build a house. Now we consider in detail each of the stages of construction.
strip foundation
As already mentioned, for the construction of a house from twinbloka suitable strip or columnar foundation. Let's take a closer look at how to do each of them. Depending on your desire, you will choose the one that you consider the best. Let's start with the strip foundation, which repeats all the bearing walls of the building.
The first thing you need to do is clear the place: remove everything that will interfere in order to get a clean area. After that it needs to be marked out. Use stakes or fittings and rope. Based on the size, insert the reinforcement or stakes around the perimeter of the building. The markup should follow the drawings of the house on the ground. Stretch a rope between them and check with a square that you have done exactly. To make sure everything is straight, measure the diagonals and compare them - they must be equal. In the same way, you need to tighten the internal layout for the base. From the outer marking you need to retreat 400-500 mm (average distance for strip foundation) and pull the rope.
Now you can dig a trench. First, determine the lowest point of the plot. From it you need to measure the depth of the trench. She, in turn, depends on the weight of the house, the depth of freezing and the type of soil. If the house is small - enough 500-700 mm deep. If the house is large, and the soil is loose - from 1 to 2 m. You can dig a trench manually or using special equipment. To dig it yourself, you will need a shovel, a tape measure and a plumb. It is important that the walls and bottom of the pit are smooth. You can check this by a plumb and level.
The principal device of strip foundations and rubble. Pour a layer of sand 100 mm on the bottom and tamp it well. Do the same with rubble. For waterproofing lay a layer of roofing material around the perimeter, then the moisture will not penetrate from the ground into the concrete. It's time to make the formwork. Its height above the ground is selected depending on climatic conditions. If winters are cold and there is a lot of snow, the base can be made 400-500 mm high, when the climate is warmer, 300-400 mm is enough. The formwork is made of planks, plywood and similar materials interconnected by screws or nails. To know what level to pour concrete, pull the line on the inner perimeter.
In order not to drill holes for sewer pipes after pouring concrete, they can be laid at this stage. Install them in the right place and fill them with sand so that they do not deform or use sleeves - pipes of larger diameter.
Foundation with ventilation holes
Reinforcement must be done before pouring concrete. To do this, take the bars of reinforcement Ø12-14 mm and tie them into a grid using knitting wire. The size of the cells may be different - the larger the mass of the house, the smaller the sides of the squares. On average, they can be 200 * 200 mm. It remains only to install the reinforcing mesh at some distance from the bottom and pour concrete.
To make concrete, it is better to have a concrete mixer, which will speed up the process of mixing the solution, consisting of sand, gravel and cement. To save time, concrete can be ordered, but it is important to know how much mortar is needed. To find out its quantity, you just need to multiply the height, width and length of the foundation between each other.
Order of the concrete mixer
The foundation must be poured immediately, without waiting for certain parts to dry. Therefore, you need to fill the foundation with layers of 200 mm, ramming concrete and expelling air. When the solution has filled all the stretched fishing line - level the surface with a trowel and wait 3-5 days, cover with polyethylene so that it will not be spoiled by precipitation, and wait a month until it is completely dry. If the weather is hot, moisten the foundation so that it does not crack. The formwork can be removed on the tenth day.
A columnar under the twin block
Make a columnar foundation too easy. First you need to prepare the surface. Mark where the pillars will be installed. Be sure to place them at the corners of the building, in the place where there is a large load and, if the walls are long, every 2-3 meters. The main thing is that the weight is distributed evenly on all the pillars.
It will take about a month to wait for the solution to dry. And only after complete drying, you can start laying walls.
Masonry starts at corners
Before to start laying, you need to lay on the foundation 1-2 layers of waterproofing material. Now you can lay the first row of blocks. This is the most important work, since the correctness of the first row depends on how correctly and precisely the first row is built.
Any laying starts at the corners. Please note that the first row must be laid on the cement-sand mortar. Even if it dries longer, it will allow you to easily adjust the blocks and align them.
Stretch the fishing line
To work, you need the following tools:
Applying glue
Apply a 10-15 mm mortar to the waterproofing layer and place the blocks at all angles. They should be perfectly aligned. To do this, use a rubber mallet and level. Between the blocks, pull the cord or fishing line, which will serve as a guide. It should not sag, so tighten it well and check the level. If the length of the wall is more than 10 m, put an additional block in the middle. Focusing on the fishing line, lay out the first row of blocks. Kayakoy tap on them to even lay. All masonry must control level. Since the wall is often not equal to the number of blocks, some of them need to fit the size. Use the hacksaw and angle: to control the cutting. After the first row is ready, you need to wait until the solution sets (2-3 hours).
The second and third rows are made in a similar way, only with a bunch, the blocks are shifted by at least 80 mm or half. Now you can apply glue instead of mortar. But before that, treat the surface of the first row with a plane to give it a roughness. Now the glue will bond better and lie flat. Apply glue to the blocks with a notched trowel. The thickness of the adhesive layer, which is applied to the entire surface and the end, should be 20-40 mm. Do not forget in places where there will be doors and windows, do not lay blocks. As soon as you have made 2 and 3 rows, 4 you need to further strengthen the reinforcement. Lay this row on the same principle. Then using the wall chaser make two parallel grooves in the blocks. Brush them and install Ø8 or 10 mm reinforcement. Remember that the ends of the reinforcement should not end at the corners or joints. It remains to fill the entire solution or glue. After that, the laying continues, as before, up to the 8th row, which will also have to be reinforced. And so every 4 row.
Reinforcement of masonry
Places, where window openings will be made, it is necessary to reinforce additionally. To do this, test on the blocks 2 lines under the future window frame and place the reinforcement there. The length of the strobe must be greater than the length of the frame 300 mm on each side. The grooves with fittings need to be filled with glue and continue laying. Then you can strengthen the space under the windows.
Window jumper device
When the window and doors are laid out to the top, jumpers must be made to design not collapsed. To do this, you can buy special U-shaped blocks or make a formwork yourself.Above the window, install the board on which the blocks will rest. Install U-shaped blocks on it, lay reinforcement and fill all with concrete. But you can do without them. Just on the same board from the outside along the edge, lay the blocks, the thickness of which is 150 mm (cut the usual block). Inside along the edge, lay blocks of 100 mm thickness. So you made a semblance of U-shaped blocks. Then everything is the same: install the frame of reinforcement and fill the space with concrete.
Reinforcement belt
Arm-belts look like jumpers that were made above the windows and doors, only the blocks are installed around the perimeter. You need to do it before constructing the ceiling and the roof. On the finished row of blocks, install the blocks cut in half so that they form a formwork. In it, put the frame of the bars of reinforcement and fill all with concrete.
The overlap should be done in cases when the house is built with several floors and before the arrangement of the roof. There are several ways how to make the ceiling: from wooden beams, metal frame or from ready-made concrete slabs that are installed on the armored belt. It is clear that such plates cannot be lifted manually, so you cannot do without the help of a crane. If you make the overlap of the beams, their ends should be cut at an angle of 60-80˚, walk antiseptic, wrap in roofing material and set in a niche, to a depth of 150 mm. Install the beams with a pitch of 1-1.5 m. After that, the crate is knocked out of the boards and the flooring is laid.
Overlaps on beams
Overlaps can be divided into the following types:
Types of floors
In your plan type the roof should already be selected. It can be:
Installation of the roofing system
The most common option is a conventional gable roof. Make it will be relatively easy. On the reinforced belt you need to lay a layer of waterproofing material. Mauerlat - bar is installed on top, which will account for the main load of the truss system. To secure it, even when pouring concrete into the armored belt, you need to weld metal studs with a 12 mm thread to the fixture in increments of 500-600 mm. They should rise above the reinforced belt at 450 mm on the same level. Holes are cut in the right places in the mauerlate, it sits on the studs and is clamped with two nuts through the washer. For better fastening, you can additionally secure the bar with anchors.
The extreme rafters, rear end and front fasteners are attached to the Mauerlat. So that they are held tight during installation, install the racks with braces in the center, which are fixed to the reinforced corner from below. Racks will support the rafters at the time of installation, after which they need to be removed. Strengthen rafters will help two bolts and additional vertical racks on the sides.
Then the ridge is installed and the rest of the rafters with crossbars, which are connected to the power plate. To lay all the rafters in the same plane, you can stretch the thread along which you will be oriented, securing the rafter legs. What will be the overhang of the roof outside the walls you decide, it is usually done at least 500-600 mm.
Now it is time to lay a 150 mm overlap layer of vapor barrier with the release outwards, then the moisture will roll down from the roof, not inwards. Do not forget to lay also insulation. Now it remains to make a crate, gables and cover the roof with roofing material.
Soft roof device
Before you finish the roof, you need to remove all the pipes: chimney and ventilation pipes.
The batten is made from planks, bars or tesa. If the role of the roofing material is rolled soft coating, the crate should be made with a minimum gap or better solid. When the roof needs to be made of tile or slate, the step can be made in 250-400 mm, depending on the wave pitch of the metal tile.
Both soft and hard coatings can serve as roofing material. Among them:
Installation of metal tile
After you lay the roofing material, the main work will be done . House of twinbloka ready. But do not rush to relax, because more is waiting for you no less work that needs to be done to live in a fully finished home.Nevertheless, if you, without having special construction skills, can make a foundation, build walls and build a roof, you can be proud of yourself and take up the rest of the work with enthusiasm.
The twin-block masonry technology can be seen in this video: