Arrangement of a private plot for permanent or seasonal residence includes, among other things, equipment for the water supply system of the house. The most successful solution to this issue is the laying of water in the ground.
A similar water supply system, designed and implemented with all the requirements for the building material used, has a number of advantages that a system mounted in any other way cannot boast.
Water supply design
Water supply system design includes the following items:
The existing terrain, as well as climatic conditions, significantly affect the creation and location of the water supply system on the private plot. In particular, the depth of frost penetration and the variant of the water supply system, which is planned to be located on the site, is of great importance. So, if you need to supply the house with water and in winter, the laying of water supply in the ground should be below freezing. With uneven terrain, it is necessary to take into account the angle of inclination of the entire water supply system and provide for the necessary pressure in the pipes for the normal supply of water to the house and its removal outside the building. On a plot with a flat terrain, professionals advise to artificially create a slope of 1-2 cm for the best movement of water in the pipes. With uneven terrain, this value should be increased or decreased in the right direction. Great importance should be given to the location of other systems on the site so that the water supply system does not intersect with any of them.
Polypropylene water pipes
Recently, polymer pipelines have become increasingly popular among owners of country plots propylene They have a lot of advantages in comparison with concrete pipes or cast iron pipes for laying water pipelines. They are:
Insert into the central water supply
System installation water supply is as follows:
The trench for the water pipe
The sand-gravel mix is laid at the bottom of the trench. In the summer, it must be compacted and shed to avoid subsequent shrinkage of the water supply system.
The waterproofing and heat insulation spreads on it, the mounted parts of the water supply system are lowered. If the pipe mounting between them implies a special soldering, it is necessary to carry it out before laying the pipes in the trench.
Pipe insulation
Fully assembled water supply system is tested during the day before final backfilling. If there are no problems with the movement of water through the pipes, then the mounted water supply system is closed with insulation and waterproofing, covered with the rest of the sand and gravel mixture and the ground.If there are problem areas in the finished water supply system, then small hatches are arranged above them, giving access to replace parts or eliminate faults.
A water pipeline conducted in this way, if all the required technical standards are observed, will serve on the site for a long time, without rusting or spoiling.